ERP rates up by S$1 for 2 locations from Jun. 29, will cost up to S$5 at certain timings
LTA is considering reinstating ERP operations for the Orchard area.
Unsplash
Electronic Road Pricing (ERP) will be increased by S$1 at two locations with effect from Jun. 29, 2026.
Prices will reach as much as S$5 at certain timings.
Increase
Traffic has built up along various stretches of expressways, according to the monitoring of traffic conditions in April 2026 by the Land Transport Authority (LTA).
The rate increment for the selected locations is aimed at managing congestion.
Land Transport Authority (LTA)
School holiday discount
There will be a school holiday discount of ERP rates at six locations for 18 specified time periods, effective from Jun. 2 to 28.
These locations and time slots were identified in anticipation of lower traffic demand.
The rates will revert to the prevailing ERP rates from Jun. 29.
These are the discounted rates:
Land Transport Authority (LTA)
Orchard congestion
LTA added that it has been closely monitoring traffic conditions and is considering reinstating ERP operations for the Orchard area.
The area has been unpriced since April 2020.
Speeds within Orchard have persistently remained below optimal since October 2025.
LTA will resume ERP operations for the "Orchard Cordon" if road congestion deteriorates further next quarter.
Rates for the other previously announced timeslots and gantries remain unchanged.
LTA will continue to monitor traffic speeds and congestion levels closely and assess if ERP rates need to be further adjusted.
MORE STORIES


















